Non-Compliance detail


  
Summary
 
Licence number: 1593
Annual Return Start: 01 Mar 2015
Annual Return End: 29 Feb 2016
Date Received: 29 Apr 2016
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L1 Discharges from point 2. Storms and heavy rainfall, defective booster pump. Upgrade reuse pump station and continuously monitor system. EPA to monitor future compliance with this condition 1
L5 37 complaints reported as odours, however these underlying causes were most frequently recorded as overflows/blockages in the reticulation system. EPA to monitor future compliance with this condition 1
L2 Exceeded actual load limit for assessable pollutant oil and grease. Tests are carried out by NATA laboratory with none of the individual samples exceeding the 100 percentile. Laboratory limitations on lower limits affect sample results. EPA to monitor future compliance with this condition 1